Brown MK3 Progress

Progress has been steady on the car since the engine and gearbox were refitted. The engine ancillaries have now all been fitted, the wiring loom has been connected along with the fitting of the centre console for the connection or switches. More interior trim and chrome work has been fitted including the freshly rechromed bumpers.

We have also refitted the fuel tank along with ethanol proof fuel lines all the way from the tank to the carb. The last section of pipe from the fuel pump to the carb is covered by a high temperature sheath to help with fuel vaporisation.

The electrical systems are now being tested and it won’t be long before the engine fires up.

The car was polished and moved outside today so that the customer could see the paintwork in the sunlight.

Leave a Reply